Ascend Clinical Labs

Relocating and Expanding a Highly Automated Testing Lab

Ascend’s relocation from Redwood City included significant growth in their automated blood testing lab and included design and installation of robotic equipment that was being designed and manufactured in parallel with the physical construction of the testing lab, requiring seamless integration with Siemens to guarantee the lab was ready to receive the equipment as it arrived custom built from Italy.

Precision Design Across Office and Laboratory Environments

Ascend’s attention to detail is evident throughout the thoughtful selection of interior office finishes, the custom and highly functional break room outfit, and the meticulous attention to efficiency placed on the lab construction.

Delivering a Critical Facility Through Pandemic Constraints

Because of their critical work, construction was allowed to progress during Covid shutdowns, but as a result of the pandemic, the project faced innumerable material and equipment shortages and delays which caused the design and construction teams to dig deep into creative measures to keep the project on track. The project would go on to win Silicon Valley’s project of the year.

Project Details

Services Provided: Construction Management, Design Management, Entitlement Management, Fit-Up Management, Permit Services, Relocation Management

Location: Sunnyvale, CA

Square Footage: 93,000

Architect: DES Architects + Engineers

Sector: Life Science & Bio Technology